FirePad64 - Production for Friends

Making Of / 24 July 2019

I made 16 copies of the project for distribution to the friends. They will be testing and reviewing the prototypes for feedback. 

I wanted to share some photo-details on that small mass production event.

Component assembly and cabling photos:

All 3d printing took 186 hours total (nearly two weeks).


These are the custom cable connector cases that I made for this product.





This photos show the LED and autofire testing on breadboards.

Finally, after all testing, all of them ready to be shipped.